Accelerating local solar generation by 2.8 billion kWh per year by 2030 is crucial to meeting Toronto’s Net Zero targets and phasing out fossil gas dependencies. Utilizing existing city assets, big-box rooftops, and parking lots maximizes clean energy production right where it is consumed. This strategy lowers grid strain, protects against volatile energy prices, and drives local green job creation without requiring new land development.
Toronto Hydro should investigate Lake Ontario’s offshore wind potential to meet energy demands. A preliminary feasibility study is a low-risk, evidence-based approach to assessing near-shore and far-offshore viability, costs, and environmental impacts. Securing a reliable, high-capacity winter energy source is essential for the City’s long-term energy independence and climate resilience.