Toronto Municipal Election 2026

Overview

The Government of Ontario is planning to meet Toronto’s electricity needs by building new high-cost nuclear reactors and ramping up the output of the Portlands gas plant on our waterfront.

This will lead to higher electricity rates and more pollution.

Fortunately, we can lower our electricity bills and clear the air by investing in much lower cost wind and solar energy.

We asked candidates these two questions:

1. Should the City of Toronto and Toronto Hydro develop a plan to increase local solar electricity generation by 2.8 billion kWh per year by 2030 (the equivalent of what the Portlands gas plant produced in 2024)? This could be achieved by installing more solar panels on City-owned buildings and parking lots and by encouraging local residents, big box stores and other commercial, institutional and industrial buildings to install solar.

2. Should Toronto Hydro undertake a preliminary feasibility study on the potential locations (near shore and far offshore) and costs and benefits of a Lake Ontario offshore wind farm?

Don Valley West Candidate Responses

Sheena Sharp

1. Question 1 (solar electricity): Yes

2. Question 2 (offshore wind): Yes

Additional comments

Yes , we need more clean energy, about double by 2050, and solar/wind/storage is the cheapest path. However, I did a high level calculation for the Toronto 2030 District and even if we covered all the buildings in the downtown, top and sides, north and south, which is not practical, we would only generate a third of what the downtown needs. The grid does not care where the solar comes from, so to wisely use society’s resources, we should out it where its cheapest: big flat roofs, small pitched roofs already have 7 year paybacks. Location like the Green Ps are perfect: shading cars while generating enough electricity to avoid expanding the Portlands plant. Absolutely look at the feasibility of wind power, but don’t overlook the fact that buying it from the rest of Ontario is also a good idea.

This is only half the job. We need to eliminate the gas systems in 14 years if we are to offer our kids a reasonable life. This is not optional.

We are constantly told that full electrification in this time period is too expensive, yet when asked how expensive: crickets. Toronto 2030 did a study 5 years ago showing the electrification was the cheapest path to decarbonization, and for most it’s affordable.

So here’s my 3rd pledge: Council needs to give Toronto Hydro direction to map out the path to 100% building and vehicle electrification., for review and discussion.